Week commencing 18 August 2025
Route No | Location | Restriction | Dates | Work Description | Contractor | |
A822 | Ladywell Railway Bridge | Road Closure (2200-0600) | 24/8/2025 | 25/8/2025 | Bridge Inspection | Network Rail |
A822 | Burrell Street, King Street Junc, Crieff | Lane Restrictions Controlled By Multiphase Temp Traffic Signals | 18/8/2025 | 26/8/2025 | Install Duct | BT Morrison |
A822 | Burrell Street, Milnab Street Junc, Crieff | Lane Restrictions Controlled By Multiphase Temp Traffic Signals | 18/8/2025 | 24/8/2025 | Install Duct | BT Morrison |
A822 | Muthill to Drummond Castle, Muthill | Lane Restrictions Controlled by Stop/Go | 11/8/2025 | 22/8/2025 | Test, Rod, Rope & Cable | BT Morrison |
A822 | Bishop's Bridge to Willoughby Street, Muthill | Lane Restrictions Controlled by Stop/Go | 14/8/2025 | 27/8/2025 | Test, Rod, Rope & Cable | BT Morrison |
A823 | Bishops Bridge to Drummawhance Junction | Lane Restrictions Controlled by Stop/Go | 14/8/2025 | 27/8/2025 | Test, Rod, Rope & Cable | BT Morrison |
A823 | Westpark Farm | Lane Restrictions Controlled by Stop/Go | 11/8/2025 | 20/8/2025 | Install Ducting & Boxes | BT Morrison |
A823 | Westpark Farm | Lane Restrictions Controlled by Stop/Go | 21/8/2025 | 25/8/2025 | Test, Rod, Rope & Cable | BT Morrison |
A922 | Main Street, Opposite The Birks, Scotlandwell | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 19/8/2025 | 19/8/2025 | Replace BT Pole | BT Circet |
A923 | Dunkeld Road, Blairgowrie | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 11/8/2025 | 22/8/2025 | Install Utilities | GTC Pipelines |
A926 | High Street,Honeyberry Crescent Junction, Rattray | Lane Restrictions Controlled By Multiphase Temp Traffic Signals | 12/8/2025 |
| Sewer Maintenance | Scottish Water |
A926 | Cattylinns to B952 Junction, Alyth | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 17/8/2025 | 28/8/2025 | Cabling and Blockage Clearing | BT KN BAU |
A926 | Damend, Alyth | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 18/8/2025 | 20/8/2025 | New Pole | BT KN BAU |
A93/A924 | Bridge of Cally at A924 Junction | Lane Restrictions Controlled By Multiphase Temp Traffic Signals | 26/5/2025 | 31/3/2026 | Bridge Damage | Tayside Contracts |
A93 | Perth Road, Carsie | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 13/8/2025 | 20/8/2025 | Sewer Repair/Maintenance | Scottish Water |
A93 | Main Road, School Road Junction, Guildtown | Lane Restrictions Controlled By Multiphase Temp Traffic Signals | 4/8/2025 | 13/8/2025 | Pedestrian Crossing Installation | Tayside Contracts |
A93 | Main Road, School Road Junction, Guildtown | Road Closure | 14/8/2025 | 18/8/2025 | Pedestrian Crossing Installation | Tayside Contracts |
A94 | Main Road, Gartwhinzean Loan to Devonshaw, Powmill | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 7/7/2025 | 14/9/2025 | Install Electricity Supply | Last Mile Electricity |
A85 | Dundee Road at Hillside Development, Perth | Lane Restrictions Controlled By Stop/Go (9.30am-3.30pm) | 20/8/2025 | 20/8/2025 | Remedial Works | CCG |
A85 | Dunkeld Road, St Catherines Road Junction, Perth | Lane Restrictions Controlled By Multiphase Temp Traffic Signals | 24/8/2025 | 24/8/2025 | Manhole Access | Telewest Comms |
U/C | South Street and Scott Street, Perth | Road Closure | 14/6/2025 | 27/1/2026 | Building Demolition | PKC |
A85(T) | Methven | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 18/8/2025 | 21/8/2025 | Street Lighting Works | BEAR Scotland NW |
A85(T) | Abercairney to East of Gilmerton | Lane Restrictions Controlled By 2 Way Temp Traffic Signals (7pm-6am) | 28/7/2025 | 19/8/2025 | Utility Works | BT Openreach |
A85(T) | Quoig, West of Crieff | Road Closure with Amnesties (7pm-5am) | 17/8/2025 | 20/8/2025 | Carriageway Resurfacing Works | BEAR Scotland NW |
A85(T) | Ledknock Bridge, Comrie | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 10/2/2025 | 2/10/2026 | Flood Prevention Works | PKC |
A85(T) | St Fillans | Lane Restrictions Controlled By 2 Way Temp Traffic Signals | 11/8/2025 | 22/8/2025 | Utility Works | BT Morrison |
A9(T) | Shierglas, Blair Atholl | Lane Restrictions Controlled By 2 Way Temp Traffic Signals (7.30pm-6am) | 26/1/2025 | 28/8/2025 | Third Party Works | Breedon |
A9(T)/A924 | Pitlochry South Junction | Off Slip Closure | 30/6/2025 | 31/12/2025 | Embankment Repairs | BEAR Scotland NW |
A9(T) | Dalguise to Dowally, North of Dunkeld | Lane Restrictions Controlled By 2 Way Temp Traffic Signals (7pm-6am) | 12/8/2025 | 30/9/2025 | Utility Works | BT Openreach |
A9(T) | Luncarty, Northbound | Convoy Working (7pm-6am) | 17/8/2025 | 3/9/2025 | Carriageway Resurfacing Works | BEAR Scotland NW |
A9(T) | Luncarty, Northbound | Northbound On and Off Slip Closures (7pm-6am) | 17/8/2025 | 6/9/2025 | Carriageway Resurfacing Works | BEAR Scotland NW |
A9(T) | Greenloaning, Southbound | Lane Closures (8.00pm-6.00am) | 19/8/2025 | 20/8/2025 | Barrier Repairs | Amey NE |
A90(T) | Swallow R-A-B | Lane Closures (7.30pm-6.30am) | 8/7/2024 | 20/8/2025 | Major Junction Upgrade | Luddon Construction |
A90(T) | Bullionfield, Northbound and Southbound | Lane Closures (7.30pm-6.30am) | 24/8/2025 | 5/9/2025 | Trial Hole Investigation | Amey NE |
A90(T) | Middlebank Farm to Rait Junction | Lane Closure and Nighttime Convoy Working (7.30pm-6.30am) | 3/8/2025 | 2/12/2025 | Barrier Repairs and Drainage Works | Amey NE |
M90(T) | Bridge of Earn Off Slip, North Bound | North Bound Off Slip Closure | 14/8/2025 | 29/8/2025 | Third Party Works | Tayside Contracts |
M90(T) | Junction 8 to Junction 9 | Road Closure and Lane Closures (8pm-5.30am) | 4/5/2025 | 27/9/2025 | Barrier Repairs | HBS |