Due to resurfacing works taking place on Crieff Road, Perth between Dunkeld Road and Fues Road it will be necessary to divert a number of Stagecoach Services.
The works are scheduled to commence on Monday, 27 July 2026 and will be in place for 2 weeks.
During these works a number of Stagecoach Services will require to be diverted as follows:
Stagecoach Service 1/Service 1A - Journeys will divert from Primrose Crescent via Auld Bond Road and Dunkeld Road. Journeys will not be able to serve part of Primrose Crescent, Tulloch Road, or Crieff Road as a result of these works.
Stagecoach Service 2/Service 2A - Journeys will be diverted from Dunkeld Road via Old Bond Road, will turn left onto Primrose Crescent, then right onto Tulloch Terrence before returning to their normal route at Tulloch Institute.
Stagecoach Service 70 - Journeys will be diverted from Dunkeld Road via Old Bond Road, will turn left onto Primrose Crescent, then right onto Tulloch Terrence before returning to their normal route at Tulloch Institute. Dunkeld Road between Holiday Inn and Asda, and the lower section of Crieff Road and Tulloch Road will not be served.
A shuttle service, Stagecoach Service S2, will be in operation between 0800 and 1800 (Monday to Saturday) and between 1000 and 1800 (Sunday) to provide journeys from the City Centre to lower Crieff Road, Tulloch Road, Tulloch Terrace, and upper Crieff Road. Please see separate entry on the Public Transport News to advise on this.
We apologise for any inconvenience that these works may cause.